Skip to Content
Menu
Dette spørgsmål er blevet anmeldt

I have MO-01 for Product #1, and MO-02 for product #2 (both with different BoM). Final products operation is to bake it in owen. Owen WC(Work center) capacity is 2. 
How could i "bake" two MO at the same time? Becouse I cant  do 'Bake' operation at the same time. Clock is ticking only for one MO. 

Avatar
Kassér
Related Posts Besvarelser Visninger Aktivitet
0
apr. 23
2022
1
sep. 24
4057
1
nov. 21
2389
2
mar. 18
6644
3
dec. 24
5966