Total Replenishment Lead Time

by
Odoo          
v 12.0 Third Party 153
Download for 12.0 series Deploy on Odoo.sh
You bought this module and need support ? Click here !
Technical name mrp_mpp_product_lead_time
LicenseLGPL-3
Websitehttp://linkedin.com/in/openvalue-consulting-472448176
Read description for v 11.0 v 10.0
Required Apps Inventory (stock)
Technical name mrp_mpp_product_lead_time
LicenseLGPL-3
Websitehttp://linkedin.com/in/openvalue-consulting-472448176
Read description for v 11.0 v 10.0
Required Apps Inventory (stock)

Total Replenishment Lead Time

New field available in product master data for entering the Total Replenishment Lead Time. The total replenishment lead time is the time needed before the product is completely available again, that is, after all BOM levels have been procured or produced. It is not calculated by the system, but defined in this field as the total of the in-house production time(s) and/or the planned delivery time(s) of the longest production path. For materials produced in-house, the replenishment lead time is to be taken into account in performing material availability checks in Master Production Plan Management. In an availability check where the system takes the replenishment lead time into consideration. The 'Total replenishment lead time' is defined at product's template level.

Please log in to comment on this module

Please choose a rating from 1 to 5 for this module.